• Client: Tuffnells
  • Location: Haydock
  • Project: Distribution Centre Extension
  • Value: £520k
  • Duration: 15 weeks
  • Description:

HB Projects were appointed to design and build a two bay portal frame extension to the existing warehouse building including some minor service yard repairs while minimising disruption to Tuffnells’ existing operations.

Summary of scope of works:

• Design and Build
• Undertaking both Principal designer and Principal contractor roles
• Two bay portal frame to best match existing design
• Groundworks
• Steel frame
• Cladding/roofing
• Provide roller shutter doors and dock leveller systems
• New LED lighting
• External service yard repairs

Case Studies
  • Kia Stanley Motors, Bradford

    commercial | new-build | refurbishment

  • Barrett Steel Buildings

    commercial | industrial | new-build

  • Kiddicare, Rotherham

    refurbishment | retail