• Client: Resource Print Solutions
  • Location: Bradford
  • Project: Space planning and office refurbishment
  • Value: £170,000
  • Duration: 8 weeks
  • Description:

The project involved the complete internal strip out of the existing building and a full office refurbishment. This included flooring, suspended ceilings, Mechanical & Electrical works, partitions and doors.

HB Projects’ joinery team created bespoke glazed partitions as a cost-effective alternative to aluminium frames and installed a specially designed fire-rated viewing window between the office and production areas. HB Projects’ internal architectural team worked very closely with the client to make sure that the particular desired look and feel was fully achieved. The client was delighted with the finished scheme which was completed on time and within the agreed budget.