• Client: Morrisons
  • Location: Tynemouth
  • Project: New Build – Home Shopping Pod
  • Value: £650k
  • Duration: 10 Weeks
  • Description:

Being the Main Contractor for the project, we were empowered to manage all direct sub-contractors of our client, as well as all HB sub-contract teams. The project was a challenging one, as the works were from the ground up beginning the first week in January in far from ideal weather and conditions. The scheme was delivered on time and on Budget and within a live environment.

Summary of scope of works:

Sub Structure Works

  • Existing car park excavations Foundations/Ground Beams
  • Combined drainage works
  • Tarmac works

 

Superstructure

  • Steel Frame
  • Cladding
  • Roof Works
  • Glazing
  • New internal cold rooms and freezer
  • Pass through refrigerated click and collect lockers
  • New connection through to existing sales floor
  • New van loading canopy

 

External works

  • Surround Fencing
  • Car park lining to new layout
  • Landscaping
  • New signage