• Client: Morrisons Plc
  • Location: East Kilbride, Glasgow
  • Project: A “Fresh Look” refurbishment of shop-floor and café
  • Value: £1.25m
  • Duration: 11 weeks
  • Description:

This is one of a number of projects we have delivered under the ‘Fresh Look’ Framework for Morrisons. This project was a full shop floor refurbishment including a refresh for the customer café area. Following drainage diversion works, a new toilet block was created and then the existing toilets were demolished to create a new Nutmeg area for the store. These works were challenging due to the temporary structural support required to allow the demolition of a section of reinforced concrete floor slab.

All works were completed within a live environment to avoid any loss of trade for the store, but also to minimise disruption to the customers.

Summary of scope of works:

 

  • Relocation of toilet blocks with new drainage
  • Realignment of counters, eg.fish and butchery areas, bakery
  • New flooring, removal of block walls
  • Customer café refurbishment, with flooring, electrical works
  • Shop floor ceiling extension
  • Resurfacing of outside car park, re-markings
  • Refreshed signage
  • New Nutmeg area
  • New ATM room
  • New Security and first aid rooms

 