• Client: Morrisons
  • Location: Dunoon
  • Project: Store extension and shop floor refurbishment
  • Value: £3.2m
  • Duration: 26 weeks
  • Description:

This store extension to a Morrisons supermarket comprised the demolition of an existing building, extension of customer car park, extensive utilities upgrades, new entrance tower, shop floor extension of 2,500 m² and a re-clad of existing elevations – all in a ‘live’ trading environment.

The project was awarded on a negotiated basis with a traditional form of contract due to the Client’s requirement for an experienced contractor with a proven live project track record. A proactive problem-solving delivery ethos, combined with strong financial management, was also required.

From the outset, this project presented huge challenges, including: the constraints of the site; extensive interaction with utilities to facilitate a power Transformer relocation and upgrade; temporary customer entrance arrangements; and the logistical challenges of working on the Argyle Peninsula.

Case Studies
  • Kia Stanley Motors, Bradford

    commercial | new-build | refurbishment

  • Barrett Steel Buildings

    commercial | industrial | new-build

  • Kiddicare, Rotherham

    refurbishment | retail