• Client: Matthew Brands
  • Location: Cleckheaton
  • Project: Space planning and office refurbishment
  • Value: £110k
  • Duration: 7 weeks
  • Description:
The project required a full office refurbishment, while all other areas in the building were kept live and operational during the works.

The first phase was strip out and demolition, including the removal and disposal of existing light fittings, air conditioning units and existing power / services from historical equipment. Ceilings and partition walls were stripped out and floor finishes removed.

The office refurbishment phase involved new ceilings, lighting, air conditioning, ventilation, lining and plastering walls, new partitions, internal decoration, new floor finishes and power and data installations. The finished scheme fully achieved the client’s aspirations to bring a modern, vibrant and fresh feel to the space.

Case Studies
  • Kia Stanley Motors, Bradford

    new-build | refurbishment | retail

  • Barrett Steel Buildings

    commercial | industrial | new-build

  • Kiddicare, Rotherham

    refurbishment | retail