• Client: Heinz Foods
  • Location: Leamington Spa
  • Project: Full dilapidation and restoration
  • Value: £
  • Duration: 10 weeks
  • Description:

Heinz Foods had come to the end of a tenancy agreement and were contracted to carry out dilapidations works prior to formal handover of the building to the owners. We were selected by the Main Contractor because of our experience in managing a diverse range of contractors, all working within the same controlled area and our ability to handle the wide scope of works required in a tight timeframe

Summary of scope of works:
  • Structural demolition of concrete mezzanine floors
  • Roof reinstatement and replacement works
  • Asbestos removal and internal stripout
  • Brick and blockwork repairs and renewals
  • External drainage, paving and hardstandings
  • Stud partitioning, door sets and joinery
  • Forming disabled toilet blocks
  • Structural steelwork and fencing works
  • General electric and plumbing works

Careful planning and communication together with strict monitoring of Health and Safety plans and procedures was essential to ensure a successful completion of the works. The timeframe was critical because of the customer’s contractual agreement and this was successfully achiev