• Client: Empiric Student Property
  • Location: Durham
  • Project: Refurbishment of student accommodation
  • Value: £380k
  • Duration: 10 weeks
  • Description:

Here are a few photographs of a fantastic project completion for Empiric Student Property plc at their city centre site in Durham.

This 10-week scheme was the refurbishment of 22 existing student apartments across 5 blocks and over 3 floors, including: 109 bedrooms; 22 kitchens; 22 shower and WC rooms and 5 stairwells.

Summary of scope of works:
  • Full strip out of floor finishes, furniture and electrical items
  • Full decoration throughout
  • New vinyl floor finishes throughout
  • New lighting and heating
  • New beds and furniture installed
  • Joinery items inc. cupboards, blinds, drawer fronts etc

Another excellent project completed for ESP, completed in time for the new term and with some really nice feedback from the customer.

Case Studies
  • Kia Stanley Motors, Bradford

    commercial | new-build | refurbishment

  • Barrett Steel Buildings

    commercial | industrial | new-build

  • Kiddicare, Rotherham

    refurbishment | retail