• Client: Asda
  • Location: Adel, Leeds
  • Project: Demolition and New Build Extension
  • Value: £1.4m
  • Duration: -
  • Description:

The works consisted of the demolition of existing and the construction of new café, toilets, landscaped areas, and public areas, An main contractor, we managed all trades whether direct or sub-contract. The project was challenging throughout, with most of the demolition and ground works taking place during the winter months, within a live environment and with the restrictions caused by the pandemic.

Summary of scope of works:

Demolition

  • Demo of existing retail shops and walkways
  • Removal of asbestos
  • Crushing of demo rubble to create the infill structure materials to create levels Substructure/Groundworks
  • Grading and levelling grounds and formations
  • Drainage installs – SW and Foul
  • Kerbs and pathways
  • Foundations
  • Concrete slabs and screeding