HB Projects Ltd was appointed by Brenntag UK Ltd, to create a new 200m2 extension to one of their existing storage warehouses. The brief included food safe hygienic lining of the new internal space, due to the nature of the products they intended to store in it.
Working closely with Edmund Haley Associates to overcome challenging ground conditions, we developed a design using a fully suspended ground floor slab supported on 20m long CFA piles.
The project was delivered on a live chemical site, with no interruption to the Client’s operation.