HB Projects received an original scope, which we developed and evolved to provide a value engineered solution for the store.
The constrained nature of the existing operation, demanded meticulous planning of the on site delivery. This included the location of site welfare at high level to minimise disruption.
A number of unforeseeable challenges were overcome throughout the project, including the discovery of a drainage attenuation tank below the new tank, which required the design, procurement and installation of a new petrol interceptor.