• Client: Asda
  • Location: Morley, Leeds
  • Project: Office refurbishment
  • Value: £3.3m
  • Duration: Phase 1 - 16 weeks, Phase 2 - 11 weeks
  • Description:

Britannia House phase 1 and 2 full refurbishment and conversion of a dilapidated 3 storey building into a modern office environment.

Summary of scope of works:

 

  • 3 storey office refurbishment
  • Strip out of contaminated waste materials and pipework from buildings previous use as a medical facility
  • Significant  demolition
  • Asbestos removal
  • Full strip out of all floors back to shell and fabric of the building
  • Full fit out
  • Design and installation of mechanical and electrical design incorporated as part of our works
  • Glazing to all floors
  • 2 sets of new toilets on each floor, break out rooms and office construction
  • New front entrance
  • Roof plant room conversion to new offices
  • New cafe on ground floor
  • Strip of and relay the roof
  • External means of escape off 3 floors
  • Drainage works

 